Wastewater System Facility Plan
The wastewater treatment facility (WWTF) was originally constructed in 1984.
The system is approaching the end of its useful life, with aging infrastructure, odor and corrosion issues, and an expiring effluent irrigation agreement.
Alternatives Considered:
Alternative 1 – Trickling Filter + Activated Sludge Hybrid
Alternative 2 – Activated Sludge
Alternative 3 – Moving Bed Biofilm Reactor (MBBR/IFAS)
Cost Comparison:
Trickling Filter & Activated
Sludge Hybrid: $35.8 M
Activated Sludge $32.9 M
MBBR $28.8 M
Read the full report here: https://hs-sd.org/Documents/Government/City%20Council/2025/09152025/09152025Packet-compressed-merged.pdf?t=202509111829250


